Our Modular elevators are built in a factory setting. The hoist way, car, and machine room are built simultaneously. Resulting in a fully assembled, high-quality elevator that can leave our plant in as little as eight weeks after the drawings have been approved. Additionally, this option eliminates the on-site challenges of inclement weather or other construction delays you might have.
Write a comment:
You must be logged in to post a comment.